Trade Docs

Web and app development quotation template

A development quotation that counts planning, design, build and checks in man-days and man-months and carries wording for the revision scope.

Web and app development items These are example items, not market or fair prices.

Document details— · — · Client —
Supplier (your details)Not filled in yet

Bank details stay in this browser and are printed on the document exactly as typed.

Pick a PNG or JPG file. The browser re-encodes it and nothing is uploaded.

Pick a PNG or JPG file. The browser re-encodes it and nothing is uploaded.

ClientNot filled in yet
Tax and roundingVAT 10%, calculated once on the total, rounded down below 1 won
VAT in the unit price
How VAT is calculated

VAT and rounding follow the rules you choose. Use the method agreed with the other party.

This only calculates with the rate you enter. It does not decide the income type or whether withholding applies. The small-amount exemption is not applied.

Document details한국어 · KRW

Display

{T} type, {yyyy} {yy} {mm} {dd} date, {###} running number.

Notes and terms
Line items
  1. 0
Other line types

A section line shows the subtotal of the items below it. A percent line takes a percentage of the amounts above, for overhead or a rush fee.

Enter an item to see the totals.

Example: 3 items at 10,000 won = 30,000 won net, 3,000 won VAT, 33,000 won total.

Calculation rule VAT 10%, calculated once on the total, rounded down below 1 won

1-won difference
BasisVAT
Once on the total0
Per line, then added0

Both methods give the same result.

A drafting tool for reference. Not tax or legal advice, and not a substitute for a tax invoice or cash receipt.

More

견적서

공급자

공급받는자

No품명규격단위수량단가금액 (원)
공급가액
0
부가세
0
합계
0원

부가세 10%, 합계에 한 번 계산, 원 미만 절사

What you type is saved in this browser only. Clearing browser data removes it, so back up with JSON.

Development is priced in effort

Development leaves nothing you can touch, so prices are often built from how long people work. The units used are the man-day (M/D, the amount one person works in a day) and the man-month (M/M, the amount one person works in a month). Put the number of people times the number of days as the quantity and the amount for one day or one month as the price.

Pressing "Fill in these items" on this page brings in three phase headings, planning and design, development, and testing and operations, with items beneath. The headings are section lines, so subtotals show separately and it is easier to explain the weight of each phase to the client.

Item checklist

ItemUnitWhat it covers
Planning and design—The stage where scope is fixed before building
Requirements and planningman-dayScreen list and feature scope written down
UI and UX designman-dayScreen layouts and visual design
Development—The build stage
Front-end developmentman-dayWhat users see and interact with
Back-end and API developmentman-dayServer logic, database and integrations
Admin consoleman-dayA screen for operators to manage content
Testing and operations—Checks and upkeep around delivery
Testing and QAman-dayChecking features and fixing defects
Deployment and server setuplotDomain, certificates and server environment
Maintenanceman-monthMonthly agreed fixes and incident response
One extra revision roundroundA revision request beyond the agreed number

These are example items, not market or fair prices. Enter the unit prices yourself.

Pin the scope and the number of revisions down on paper

The most common dispute in a development project is "I thought that was included". Write the scope, such as the number of screens, the feature list and the supported devices and browsers, in the notes or in the item names, and say that requests beyond the agreed number of revisions are quoted separately as an "extra revision round".

Putting a sentence in the terms that demands not in the quotation are priced again in a new quotation makes it easier to talk when the scope grows.

Sample wording for the quotation

  • "This quotation is based on the agreed number of screens and feature list, and demands beyond that scope are priced again separately."
  • "Revisions are included up to two rounds at the concept stage and one round at the build stage."
  • "Source code and deliverables are handed over after the balance is paid."
  • "Defects within the agreed scope are fixed free of charge for 30 days after delivery."

Things to watch

The effort prices and revision counts are examples, and this tool does not tell you market rates. A software contract should set copyright, usage rights and confidentiality in a contract of its own. If you work as a freelancer, check whether withholding is needed and, if so, use the 3.3% option on the freelancer invoice page.

What the person receiving the quotation should check

People receiving a development quotation care less about technical terms than about scope, schedule and cost. When the points below show in the document, both sides start from the same picture.

  • See whether the feature list and number of screens are written and how far the supported devices and browsers go.
  • Check how many revisions are included and how anything beyond is billed.
  • Ask when you receive the source code and deliverables and how far maintenance goes afterwards.
  • Check whether effort is in man-days or man-months and whether the number of people is visible.

Questions about this document

  • How do I convert between M/D and M/M?

    There is no fixed rule, and a month is often taken as around 20 working days. This tool does not convert, so pick one unit and use it consistently in a document.

  • Can I enter fractional effort?

    Yes. Quantity takes up to three decimals, so values such as 0.5 or 2.25 are fine.

  • How do I add a flat monthly maintenance fee?

    On the "Maintenance" line, put the number of months as the quantity and the monthly amount as the price. Write what work it covers next to the item name or in the notes.

  • I want to take a deposit and a balance.

    Continue as an invoice and turn on split billing by percentage. The last part is worked out as the remainder automatically.

  • Can I quote in a foreign currency?

    Change the currency to dollars or euros in the document settings. You can type the tax rate yourself, but withholding and the amount in Korean words appear only for won.

  • I need an English quotation.

    Switch the document language to English or Korean plus English and the labels print in English. Descriptions are printed as you typed them, so write them in English.