Trade Docs

Construction quotation template

A construction quotation split into materials, labor and expenses, with overhead and profit calculated on percent lines.

Construction items These are example items, not market or fair prices.

Document details— · — · Client —
Supplier (your details)Not filled in yet

Bank details stay in this browser and are printed on the document exactly as typed.

Pick a PNG or JPG file. The browser re-encodes it and nothing is uploaded.

Pick a PNG or JPG file. The browser re-encodes it and nothing is uploaded.

ClientNot filled in yet
Tax and roundingVAT 10%, calculated once on the total, rounded down below 1 won
VAT in the unit price
How VAT is calculated

VAT and rounding follow the rules you choose. Use the method agreed with the other party.

This only calculates with the rate you enter. It does not decide the income type or whether withholding applies. The small-amount exemption is not applied.

Document details한국어 · KRW

Display

{T} type, {yyyy} {yy} {mm} {dd} date, {###} running number.

Notes and terms
Line items
  1. 0
Other line types

A section line shows the subtotal of the items below it. A percent line takes a percentage of the amounts above, for overhead or a rush fee.

Enter an item to see the totals.

Example: 3 items at 10,000 won = 30,000 won net, 3,000 won VAT, 33,000 won total.

Calculation rule VAT 10%, calculated once on the total, rounded down below 1 won

1-won difference
BasisVAT
Once on the total0
Per line, then added0

Both methods give the same result.

A drafting tool for reference. Not tax or legal advice, and not a substitute for a tax invoice or cash receipt.

More

견적서

공급자

공급받는자

No품명규격단위수량단가금액 (원)
공급가액
0
부가세
0
합계
0원

부가세 10%, 합계에 한 번 계산, 원 미만 절사

What you type is saved in this browser only. Clearing browser data removes it, so back up with JSON.

A construction quotation is split by cost type

Construction costs are usually split into three cost types: materials, labor and expenses. Materials are what goes into the work, labor is the people who do it directly, and expenses are everything else such as equipment hire, haulage and safety management. A common way is to add general overhead and profit as percentages on the total of those three.

Pressing "Fill in these items" on this page brings in the three section headings with items, plus percent lines for overhead and profit. The headings are section lines, so each cost type gets a subtotal.

Item checklist

ItemUnitWhat it covers
Materials—Cost of materials that go directly into the work
Main materialslotKey materials such as rebar, concrete, timber and finishes
Sundry materialslotNails, adhesive and temporary materials
Labor—Cost of the people who carry out the work
Site laborperson-dayPeople and days worked on site
Skilled tradesperson-daySkilled work such as electrical, plumbing and plastering
Expenses—Costs outside materials and labor
Equipment hireunit-dayExcavators, scaffolding and cranes
HaulagelotTransport of materials and waste
Safety and insurancelotCosts of site safety and construction insurance
General overhead—Indirect costs as a percentage of the amounts above
Profit—Profit as a percentage of the amounts above

These are example items, not market or fair prices. Enter the unit prices yourself.

Overhead and profit use percent lines

Overhead and profit are a percentage of the amounts above, so use this tool's percent line. A percent line multiplies the total of the item and discount lines above it by the percentage and cuts off below 1 won. The profit line does not include the overhead line in its base, so if you want profit on an amount that already includes overhead you must work out that amount yourself and enter it.

For example, with 20,000,000 won in the cost types and overhead at 5% and profit at 10%, the lines come to 1,000,000 and 2,000,000 won. The percentages are for the contracting parties to set. This page leaves them empty so you type them in.

Sample wording for the quotation

  • "Design changes and extra work are settled separately."
  • "If material prices change sharply, we will discuss it in advance."
  • "The construction period is 60 days from the start date, and natural disasters and permit delays are not counted."
  • "Please request defect repairs within the agreed period after completion."

Things to watch

Construction may need a licence, registration or permits. This tool does not judge those requirements and only calculates. The period in the wording above is an example. Set the price and the scope of liability in a contract rather than a quotation, and confirm legal questions with a professional.

What the person receiving the quotation should check

A construction quotation involves big sums and long periods, so the reader goes through it closely. When cost types, percentages and the way changes are settled are visible, contract talks go faster.

  • Check that the split into materials, labor and expenses and each subtotal are visible.
  • See whether the percentages for overhead and profit and what they are calculated on are written.
  • Check that the document says how design changes or extra work are settled.
  • Ask whether the defect repair period and how to request it are set separately in the contract.

Questions about this document

  • How do I separate direct and indirect costs?

    Treating materials, labor and expenses as direct costs and overhead and profit as indirect items is common. This page builds the lines in that order.

  • Is there a set overhead percentage?

    The percentage depends on the contract or the client's rules, so this tool does not put a value in. Type it on the percent line.

  • How do I calculate profit on a base that includes overhead?

    A percent line does not include another percent line in its base. If you want the percentage on the sum including overhead, work that amount out yourself and put it on an item line.

  • Can I show a quotation per trade?

    Dividing with section lines by trade gives a subtotal per trade. To use cost types and trades together, add one more section line.

  • Is a bill of quantities the same as the quotation?

    In this tool they are the same document. A long detailed list can run to 100 lines.

  • I want to be paid in stages.

    Continue as an invoice and turn on split billing to divide it into deposit, interim and final payments, by percentage or amount.