견적서
공급자
공급받는자
| No | 품명 | 규격 | 단위 | 수량 | 단가 | 금액 (원) |
|---|
- 공급가액
- 0
- 부가세
- 0
- 합계
- 0원
부가세 10%, 합계에 한 번 계산, 원 미만 절사
A renovation quotation split by trade, with subtotals. Fill in the items and type only the quantities and prices.
Interior renovation items These are example items, not market or fair prices.
Bank details stay in this browser and are printed on the document exactly as typed.
Pick a PNG or JPG file. The browser re-encodes it and nothing is uploaded.
Pick a PNG or JPG file. The browser re-encodes it and nothing is uploaded.
VAT and rounding follow the rules you choose. Use the method agreed with the other party.
This only calculates with the rate you enter. It does not decide the income type or whether withholding applies. The small-amount exemption is not applied.
Display
{T} type, {yyyy} {yy} {mm} {dd} date, {###} running number.
Enter an item to see the totals.
Example: 3 items at 10,000 won = 30,000 won net, 3,000 won VAT, 33,000 won total.
Calculation rule VAT 10%, calculated once on the total, rounded down below 1 won
| Basis | VAT |
|---|---|
| Once on the total | 0 |
| Per line, then added | 0 |
Both methods give the same result.
A drafting tool for reference. Not tax or legal advice, and not a substitute for a tax invoice or cash receipt.
공급자
공급받는자
| No | 품명 | 규격 | 단위 | 수량 | 단가 | 금액 (원) |
|---|
부가세 10%, 합계에 한 번 계산, 원 미만 절사
Bank details stay in this browser and are printed on the document exactly as typed.
Pick a PNG or JPG file. The browser re-encodes it and nothing is uploaded.
Pick a PNG or JPG file. The browser re-encodes it and nothing is uploaded.
VAT and rounding follow the rules you choose. Use the method agreed with the other party.
This only calculates with the rate you enter. It does not decide the income type or whether withholding applies. The small-amount exemption is not applied.
Account balance
Display
{T} type, {yyyy} {yy} {mm} {dd} date, {###} running number.
Enter an item to see the totals.
Example: 3 items at 10,000 won = 30,000 won net, 3,000 won VAT, 33,000 won total.
Calculation rule VAT 10%, calculated once on the total, rounded down below 1 won
| Basis | VAT |
|---|---|
| Once on the total | 0 |
| Per line, then added | 0 |
Both methods give the same result.
A drafting tool for reference. Not tax or legal advice, and not a substitute for a tax invoice or cash receipt.
공급자용
공급자
공급받는자
| No | 품명 | 규격 | 단위 | 수량 | 단가 | 금액 (원) |
|---|
인수자 서명: ____________________
부가세 10%, 합계에 한 번 계산, 원 미만 절사
공급받는자용
공급자
공급받는자
| No | 품명 | 규격 | 단위 | 수량 | 단가 | 금액 (원) |
|---|
인수자 서명: ____________________
부가세 10%, 합계에 한 번 계산, 원 미만 절사
Bank details stay in this browser and are printed on the document exactly as typed.
Pick a PNG or JPG file. The browser re-encodes it and nothing is uploaded.
Pick a PNG or JPG file. The browser re-encodes it and nothing is uploaded.
VAT and rounding follow the rules you choose. Use the method agreed with the other party.
This only calculates with the rate you enter. It does not decide the income type or whether withholding applies. The small-amount exemption is not applied.
Installments
Display
{T} type, {yyyy} {yy} {mm} {dd} date, {###} running number.
Enter an item to see the totals.
Example: 3 items at 10,000 won = 30,000 won net, 3,000 won VAT, 33,000 won total.
Calculation rule VAT 10%, calculated once on the total, rounded down below 1 won
| Basis | VAT |
|---|---|
| Once on the total | 0 |
| Per line, then added | 0 |
Both methods give the same result.
A drafting tool for reference. Not tax or legal advice, and not a substitute for a tax invoice or cash receipt.
공급자
공급받는자
| No | 품명 | 규격 | 단위 | 수량 | 단가 | 금액 (원) |
|---|
부가세 10%, 합계에 한 번 계산, 원 미만 절사
What you type is saved in this browser only. Clearing browser data removes it, so back up with JSON.
Renovating a whole home runs from demolition to the final clean, and one line saying "interior work, lump sum" invites disputes later about what was included. So a quotation is split into one line per trade, each with a short note on what the work covers.
Pressing "Fill in these items" on this page brings in twelve trades from site protection to final cleaning, plus a site management percent line. Values that differ by site, such as the grade of materials or the area, go into the quantity field, and trades you do not need can be deleted.
| Item | Unit | What it covers |
|---|---|---|
| Site protection | lot | Floor, lift and corridor covering and temporary site facilities |
| Demolition and waste removal | lot | Stripping old finishes and fittings and hauling the waste away |
| Plumbing | lot | Moving or replacing water supply, drainage and heating pipes |
| Electrical and lighting | lot | Wiring, panels, sockets, light fittings and installation |
| Carpentry | lot | Walls, ceilings, door frames and built-in storage |
| Insulation and waterproofing | lot | Insulation against condensation and waterproofing of bathrooms and balconies |
| Tiling | sqm | Bathroom, kitchen and entrance tiles with grouting |
| Wallpaper and painting | lot | Wallpaper, paint and filler work with sundries |
| Flooring | sqm | Wood, vinyl or tile floor finishes |
| Windows and frames | ea | Replacing windows and doors, screens and silicone sealing |
| Kitchen and bathroom fixtures | lot | Sinks, basins, toilets and taps, supplied and fitted |
| Final cleaning | lot | A finishing clean to remove dust and building marks |
| Site management fee | — | Supervision and scheduling as a percentage of the amounts above |
These are example items, not market or fair prices. Enter the unit prices yourself.
Add a section line and the subtotal of the items below it appears automatically, so you can group them as in "carpentry total". A percent line such as the site management fee multiplies the total of the items and discounts above it by the percentage you set. Other percent lines above are not part of that base.
For example, if the total above is 10,000,000 won and the site management fee is 5%, 500,000 won is added. The percentage can have up to two decimals and anything below 1 won is cut off.
The items on this page only carry names and units as examples. They are not market or fair prices, so every amount is yours to set. For a large job, fix the scope of work, liability for defects and payment timing in a contract rather than in the quotation. Whether a job needs a construction licence or registration is not something this tool decides.
A quotation is not only for the writer. The person receiving it compares it with others. Knowing what the reader will wonder about lets you write more clearly from the start.
There is no fixed number. Split it enough for the client to see what the money is for, often around ten. Use fewer for a small job.
On the tiling or flooring line, put the area in square metres as the quantity and the price per square metre as the price. Quantity takes up to three decimals.
Whether it sits inside the demolition line or has its own line depends on how you contract. Either way, write down what is included.
Rather than a new quotation, add lines to the same one and save it as a revised version. A saved document keeps its number when you edit and save it again.
Use "Continue as Statement" and the breakdown per trade carries over. After completion you can continue as an invoice too.
Many renovation quotations are VAT-exclusive. If your prices include VAT, switch to the inclusive method under "Tax and rounding". Whether VAT applies is not decided by this tool.