Trade Docs

Interior renovation quotation template

A renovation quotation split by trade, with subtotals. Fill in the items and type only the quantities and prices.

Interior renovation items These are example items, not market or fair prices.

Document details— · — · Client —
Supplier (your details)Not filled in yet

Bank details stay in this browser and are printed on the document exactly as typed.

Pick a PNG or JPG file. The browser re-encodes it and nothing is uploaded.

Pick a PNG or JPG file. The browser re-encodes it and nothing is uploaded.

ClientNot filled in yet
Tax and roundingVAT 10%, calculated once on the total, rounded down below 1 won
VAT in the unit price
How VAT is calculated

VAT and rounding follow the rules you choose. Use the method agreed with the other party.

This only calculates with the rate you enter. It does not decide the income type or whether withholding applies. The small-amount exemption is not applied.

Document details한국어 · KRW

Display

{T} type, {yyyy} {yy} {mm} {dd} date, {###} running number.

Notes and terms
Line items
  1. 0
Other line types

A section line shows the subtotal of the items below it. A percent line takes a percentage of the amounts above, for overhead or a rush fee.

Enter an item to see the totals.

Example: 3 items at 10,000 won = 30,000 won net, 3,000 won VAT, 33,000 won total.

Calculation rule VAT 10%, calculated once on the total, rounded down below 1 won

1-won difference
BasisVAT
Once on the total0
Per line, then added0

Both methods give the same result.

A drafting tool for reference. Not tax or legal advice, and not a substitute for a tax invoice or cash receipt.

More

견적서

공급자

공급받는자

No품명규격단위수량단가금액 (원)
공급가액
0
부가세
0
합계
0원

부가세 10%, 합계에 한 번 계산, 원 미만 절사

What you type is saved in this browser only. Clearing browser data removes it, so back up with JSON.

A renovation quotation is split by trade

Renovating a whole home runs from demolition to the final clean, and one line saying "interior work, lump sum" invites disputes later about what was included. So a quotation is split into one line per trade, each with a short note on what the work covers.

Pressing "Fill in these items" on this page brings in twelve trades from site protection to final cleaning, plus a site management percent line. Values that differ by site, such as the grade of materials or the area, go into the quantity field, and trades you do not need can be deleted.

Item checklist

ItemUnitWhat it covers
Site protectionlotFloor, lift and corridor covering and temporary site facilities
Demolition and waste removallotStripping old finishes and fittings and hauling the waste away
PlumbinglotMoving or replacing water supply, drainage and heating pipes
Electrical and lightinglotWiring, panels, sockets, light fittings and installation
CarpentrylotWalls, ceilings, door frames and built-in storage
Insulation and waterproofinglotInsulation against condensation and waterproofing of bathrooms and balconies
TilingsqmBathroom, kitchen and entrance tiles with grouting
Wallpaper and paintinglotWallpaper, paint and filler work with sundries
FlooringsqmWood, vinyl or tile floor finishes
Windows and frameseaReplacing windows and doors, screens and silicone sealing
Kitchen and bathroom fixtureslotSinks, basins, toilets and taps, supplied and fitted
Final cleaninglotA finishing clean to remove dust and building marks
Site management fee—Supervision and scheduling as a percentage of the amounts above

These are example items, not market or fair prices. Enter the unit prices yourself.

How to read subtotals and the site fee

Add a section line and the subtotal of the items below it appears automatically, so you can group them as in "carpentry total". A percent line such as the site management fee multiplies the total of the items and discounts above it by the percentage you set. Other percent lines above are not part of that base.

For example, if the total above is 10,000,000 won and the site management fee is 5%, 500,000 won is added. The percentage can have up to two decimals and anything below 1 won is cut off.

Sample wording for the quotation

  • "This quotation covers the drawings and the specifications agreed, and defects found on site are discussed separately."
  • "Extra work starts after written agreement and is settled separately."
  • "Materials follow the products and grades you chose, and we will tell you in advance if an equivalent substitute is needed."
  • "The deposit and the balance are billed in step with the stages of the work."

Things to watch

The items on this page only carry names and units as examples. They are not market or fair prices, so every amount is yours to set. For a large job, fix the scope of work, liability for defects and payment timing in a contract rather than in the quotation. Whether a job needs a construction licence or registration is not something this tool decides.

What the person receiving the quotation should check

A quotation is not only for the writer. The person receiving it compares it with others. Knowing what the reader will wonder about lets you write more clearly from the start.

  • See whether every trade has a note on what the work is. A single lump-sum line leaves the scope unclear.
  • Check whether the grade or product of materials is written, and ask whether an equivalent substitute is allowed.
  • See whether the way extra work is settled is written down as a sentence.
  • When comparing several quotations, line up the same trades side by side.

Questions about this document

  • How many trades should I split it into?

    There is no fixed number. Split it enough for the client to see what the money is for, often around ten. Use fewer for a small job.

  • How do I enter area-based items?

    On the tiling or flooring line, put the area in square metres as the quantity and the price per square metre as the price. Quantity takes up to three decimals.

  • Should I charge for waste disposal separately?

    Whether it sits inside the demolition line or has its own line depends on how you contract. Either way, write down what is included.

  • What if items grow during the work?

    Rather than a new quotation, add lines to the same one and save it as a revised version. A saved document keeps its number when you edit and save it again.

  • Can I turn the quotation into a statement?

    Use "Continue as Statement" and the breakdown per trade carries over. After completion you can continue as an invoice too.

  • Should VAT be included?

    Many renovation quotations are VAT-exclusive. If your prices include VAT, switch to the inclusive method under "Tax and rounding". Whether VAT applies is not decided by this tool.